Construction of reservoirs, stations and facilities - NIS 26.5 million

Due to the distance of the city from its water sources, Hagihon is constructing in Jerusalem a water collection system that prevents shortage of water and suffering during malfunctions in the water transportation system to the city. In addition, the mountainous topography of Jerusalem dictates the need to pump water into the city's high areas and pressure break to low areas. Pump stations and pressure reduction stations are therefore established in the new neighborhoods as required.
 
Gan Saker reservoir - NIS 22 million
Gan Saker reservoir project was launched during 2019 and is being implemented in two phases. Phase I includes the excavation project to the reservoir, which will be completed during the first quarter of 2020. Phase II includes the completion of detailed planning and preparation of tender documents with the aim of selecting a contractor and completing the reservoir works during the second quarter of 2020. The project is scheduled to be completed in the last quarter of 2022.
The reservoir is planned for 25,000 cubic meters and its role is to meet the growing water needs in the city center, as well as to regulate the water supply to Jerusalem, which is expected to grow significantly in the years to come as a result of the construction of the fifth line in a diameter of 100", which is carried out by Mekorot company.
 
Pressure reduction facility in the western side at Mevaseret Zion - NIS 0.4
Construction of a pressure reduction facility for Hamagresa neighborhood that will also be used to back up water supplies to the community's located in the middle pressure area. The source of supply to the pressure reduction facility is Mekorot main source line with high pressure. The purpose of the pressure reduction is to supply water at pressures appropriate to the new neighborhood.
Pressure reduction facility at Vadi Kadum, East Jerusalem - NIS 0.3 million
Building a pressure reduction facility that will serve Vadi kadum area. The purpose of reducing the pressure is to mitigate the high pressures that exist in the region and to comply with the regulatory requirements.
Pressure reduction facility and metering system at A-Tur neighborhood – NIS 0.4 million
Building a pressure reduction facility and a metering system that will serve A-tur neighborhood. The purpose of reducing the pressure is to mitigate the high pressures that exist in the region and to comply with the regulatory requirements. In addition, a regional water meter will be installed to provide up-to-date information on water losses at the site.
 
Pressure reduction facility instead of Arazim reservoir at Mevaseret Zion – NIS 0.4 million
In 2019, the planning of a new pressure reduction facility was completed to supply water to a low-pressure area in Mevaseret Zion, instead of Arazim reservoir which serves as an outdated and less reliable pressure reduction facility for the neighborhood. Abolishing the reservoir will save the cost of maintenance. Implementation will begin during 2020.
 
Upgrading the pumping station at Gilo - NIS 0.5 million
During the year 2019, Gilo pumping station design was finished. The work is scheduled for 2020. The pumping station was designed to meet Jerusalem Master Plan 2040. The station will supply the growing water needs in the developing Gilo neighborhood.
 
Pressure reduction facility at Abu Gosh (680) - NIS 0.135 million